Category
Tags

WHAT IS THIS ?

In HAZOP analysis, an interdisciplinary team uses a systematic approach to identify hazards and operability problems occurring as a result of deviations from the intended range of process conditions, using a fixed set of guide words which are applied to process parameters at discrete locations, or study nodes, in the system.

Hazard Identification (HAZID) is a technique for identifying, at a high level, all significant hazards associated with the particular facility, unit or operation under consideration. It is a systematic review of the causes and consequences of hazardous events. HAZID can be applied to a wide range of different facilities and is not limited to oil & gas facilities.

Safety integrity and safety integrity level (SIL) are concepts defined in the Safety Instrumented System (SIS) safety lifecycle. SIL is a property of a safety function rather than of a system or any part of a system, and includes both hardware safety integrity and systematic safety integrity.
Project Estimating management is a part of integrated management to accurate and calculation of quantity and quantification of risk. During HAZID/HAZOP/SIL happens some of report and also some recommendation have to implemented on currency. The problem arise during calculation of risk happened after HAZID/HAZOP/SIL report.

Project Cost and Estimation is the process of management in determining cost and budget for a project. Estimating applies during project initiation and bidding or quotation, while determining budget or costing takes the position of project executing. In turn estimating and costing determine the cash flow project and project completion determine profit and margin.

Project Cost and Estimation not only calculate and determine the price of equipments, but more than that also work on quantitative analysis of work estimation. The effectiveness and efficiency of a project is reflected in the estimating and costing running at all times.

The most important costing and estimates are knowing, understanding, and being able to perform sequencing analysis from Engineering, the interface among of Procurement, and Resources Loading Construction. An estimator must be capable and supported in Engineering aspects, such as CTR, HAZID/HAZOP/SIL reports then forwarding and supply chain calculations for procurement, and of course.

WHAT YOU GET IT ?

* To IDENTIFY AND ESTIMATION the cost, cause, and consequences of perceived mal-operations and equipment and associated operator interfaces in the context of the complete system

* To PROVIDE a framework for HAZOP/HAZID/SIL AND ESTIMATION within costing budget, risk assessment and HSE Management System

* To INCREASE familiarity with HAZOP/HAZID/SIL AND ESTIMATION protocol, logic, structure, costing estimation and methodology

* To DESCRIBE the role and structure of the HAZOP/HAZID/SIL AND COST ESTIMATION Team and procedures

* To RECOGNISE AND ESTIMATE the management functions core competences of supervision and role of the supervisor and manager with respect to risk assessment

* To APPRECIATE the application of HAZOP/HAZID/SIL AND COSTING ESTIMATION methodology in other areas of interest

WHO ARE THE INSTRUCTORS ?

Ir. Muhammad Zahirsyah, MT.

He has 18 years’ experience in offshore/ onshore oil and gas, geothermal and petrochemical projects, commissioning, and plant operations. He has a Master’s Degree from the Institut Teknologi Bandung (ITB) and is a candidate doctoral at Universitas Indonesia (UI), majoring in Chemical Engineering.
His extensive experience includes project management as Project Manager and Engineering Manager for numerous engineering design projects (conceptual design, FEED, and detailed engineering design). He is well-versed with international codes/ standards and specifications such as API, NFPA, ASME, NACE, TEMA, DNV, ANSI, etc.

His broad client experience includes work executed for: ConocoPhillips, Pertamina EP, Kangean Energy Indonesia (KEI), ENI Muara Bakau, BV., Chevron Pacific Indonesia (CPI), PGN, PLN, Exxon Mobil, PTT Thailand, Petronas, HESS, JOB Pertamina Talisman Jambi Merang, JOB Medco Tomori, Medco Energi Internasional Tbk., PetroChina International Jabung Ltd., Husky CNOOC Madura Ltd. (HCML), VICO Indonesia, Premier Oil Natuna Sea, BV., TOTAL Indonesie, Pertamina Hulu Energi ONWJ, Pertamina Hulu Energi WMO, Star Energy Ltd., British Petroleum (BP), etc.

Muhammad Ade Irfan, IPM.

He has more than 20 years experience on Costing, Estimation, and Project Management. He studied on Teknik Perkapalan ITS and Magister Management UGM Jogjakarta, has experience on construction and company on with position as Estimation Manager and Package (Subcontract) Manager for onshore and offshore project. Some experience Client as follows : PT. Waskita Karya (Persero) Tbk., PT. Surveyor Indonesia (Persero), PT. Bakrie Construction, PT. Raga Perkasa Ekaguna, BP Berau Ltd., PT. Pertamina EP., Petronas Carigali (Ketapang) Ltd., CNOOC SES Ltd., PHE ONWJ., PHE WMO., HCML., DNV-GL., PT. Chandra Asri, and Evonik Sumi Asih. Expert Consultant Cost and Estimation on DNV-GL and PT. Pertamina (Persero), which scope of work FEED dan Detail Design Engineering. Certified as Insinyur Profesional Madya (IPM) from Persatuan Insinyur Indonesia (PII), Cost Estimation Professional Engineer (CCEP) from Norway Cost and Estimation Association Professional, Supply Chain Project Management (CSCPM) from British Association Supply Chain Professional, and certified as ASEAN Engineer (ASEAN Eng.) from ASEAN Federation of Engineering Organizations (AFEO).

WHO SHOULD ATTEND ?

The course will be of use to a wide range of disciplines whether in design, development, production, maintenance or a safety/environmental role. People in all these disciplines regularly lead, or are involved in HAZOP/HAZID/SIL and Costing Estimation studies. These includes: Managers, Risk Assessors, Operators / Technicians who deal with HAZOP/HAZID/SIL, Cost Estimator, Project Engineer, Lead Engineer, Senior Engineer, Project Manager, Cost Controller, PPC Officer, Finance Officer,Scheduller, Designer, and Proposal Officer

WHAT BENEFIT FOR PARTICIPANTS ?

The objective of this course are :

1. Participants know and having capability to identification and execute HAZID/HAZOP/SIL and Cost Estimation Management,

2. Participants know and solving case study on HAZID/HAZOP/SIL and Cost Estimation Management

3. Participants have capability to describing and pointing HAZID/HAZOP/SIL and Cost Estimation Management.

IMPORTANT DATE AND VENUE

Training scheduled on 07 – 10 August 2018, 08.00 – 17.00 (Jakarta Time).
Training will conduct on Pomelotel Hotel, Jalan Dukuh Patra Raya No.28, Kuningan, RT.11/RW.1, Menteng Dalam, Jakarta Selatan 12870.

HOW TO REGISTERATION ?

Registeration for participants via Mr. Arfi Yesso, Badan Kejuruan Mesin – PII, email : bkmesin_pii@yahoo.co.id and arfi.yesso@gmail.com, phone : 021 31904667, 0813 1671 6412.

HOW MUCH THE INVESTMENT ?

Fee for every participant is Rp 8.000.000,- (non member PII) or Rp 7.000.000,- (member PII), with facility softfile and hardfile (training material), lunch, certificate, snacks.

AGENDA

DAY 01
* Introduction Risk Management
* HAZOP/SIL/HAZID Definition

DAY 02
* Mechanical Equipment Risk Management
* Piping Risk Management
* Case Study and Solving

DAY 03
* Cost and Estimation Engineering
* Cost and Estimation Procurement
* Cost and Estimation Construction
* Case Study and Solving

DAY 04
* Cost to Complete
* Cost Control and Account Code

No responses yet

Leave a Reply

Your email address will not be published.